| 1 | | Phases 1–3 (pre-2026-06-05) |
| 2 | | 2026-06-05 - Phases 4 + 5 (Handoff v1) |
| 3 | | 2026-06-05 - Phase 5.1 + Docker (Handoff v2) |
| 4 | | 2026-06-05 - v3 Polish (Handoff v3) |
| 5 | | 2026-06-06 - Visual Patches + Docker Overhaul |
| 6 | | 2026-06-11 - Security Audit |
| 7 | | 2026-06-11 - Rename: apiv → envv |
| 8 | | 2026-06-11/12 - Bug Audit + ENV Link Feature |
| 9 | | 2026-06-12 - Full Bug Audit + Fixes |
| 10 | | 2026-06-12 - Linking & Resolver Expansion (Prefix/Chunk/Cross-Chunk + Health/Server) |
| 11 | | 2026-06-13 - Remote RBAC, Discord-style hierarchy, sidebar/cert UX |
| 12 | | 2026-08-07 - Audit and phases 7–10.1 |
| 13 | | 2026-08-08 - Frontend test suite and module audit (phase 11) |
| 14 | | 2026-08-08 - Vault-switch render bug, three fixes |
| 15 | | 2026-08-08 - UX persistence, window state, LAN fix (phase 12) |
| 16 | | 2026-08-23 - CLI parity with the UI, and two exporter bugs it uncovered (phase 13) |
| 17 | | 2026-08-23 - Agent-safe CLI, custom icons, live enrichment, cross-platform (phases 14–15) |
| 18 | | 2026-08-24 - Card sizing, repo cleanup, and the CLAUDE.md drift audit |
| 19 | | 2026-08-25 - Tooling, release automation, key pools (phase 16) |
| 20 | | 2026-08-25 - CI unblocking, handoff reorganisation, and the 1.0 plan |
| 21 | | 2026-08-25 - Phases 17 and 18 implemented, CI unblocked twice, README rewritten |
| 22 | | 2026-08-27 - Phase 20 observability, secret creation dates, an ICS calendar feed, and envv use |
| 23 | | 2026-08-31 - Review-01 defect fixes, the Key Pools sidebar, and the Nodes design |
| 24 | | Phase 22 designed: credential shape, copy profiles, env naming |
| 25 | | 2026-09-04 - Caps Lock bug, and Phase 19 finished (TOTP, onboarding, accessibility) |
| 26 | | 2026-09-04 |
| 27 | | Phase 21 fixed, Phase 22 allocated and implemented (TOTP as a stored secret) |
| 28 | | 2026-09-10 |
| 29 | | 2026-09-11 |
| 30 | | 2026-09-13 |
| 31 | | 2026-09-14 |
| 32 | | 2026-09-14 - Planning Phase 24 and 24.1–24.4 |
| 33 | | 2026-09-14 |
| 34 | | 2026-09-21 - Phase 24 continuation |
| 35 | | 2026-09-21 - Phase 24 continuation |
| 36 | | 2026-09-21 - Phase 24 continuation |
| 37 | | 2026-10-08 - Phase 24 and 24.1–24.5, everything that can be built |
| 38 | | 2026-10-08 - Phase 25, route coverage and permission-expression parity |
| 39 | | 2026-10-08 - Phase 26, outward redaction engine |
| 40 | | 2026-10-08 - Phase 27, UI-lab triage (layout backlog 1,155 → 0) |
| 41 | 2026-10-08 | Phase 28: escape by construction |
| 42 | 2026-10-08 | Phase 29: the config compiler |
| 43 | 2026-10-08 | Phase 30: storage, row-per-entry, schema v2 |
| 44 | | Phase 31: the provider catalogue (2026-10-08) |
| 45 | | Phase 32: "Does it actually do anything?" (2026-10-08) |
| 46 | | Phase 32.1: efficacy audit of the dynamic controls (2026-10-08) |
| 47 | | Phase 32.2: the last controls (2026-10-08) |
| 48 | | Phase 32.3 and Phase 33 (UI ⇄ CLI parity, mechanical half) (2026-10-08) |
| 49 | | Phases 33.1b to 33.7: the remaining parity gaps (2026-10-08) |
| 50 | | Goal |
| 51 | | 2026-10-09 - Phase 34: Nodes |
| 52 | | 2026-10-09 - Phase 35: the config time machine |
| 53 | | 2026-10-09 - Phase 36: blast radius |
| 54 | | 2026-10-09 - Phase 37: approval |
| 55 | | 2026-10-09 - Phase 38: stack integrations |
| 56 | | 2026-10-09 - Phase 39: pre-1.0 security review and pentest checklist |
| 57 | | 2026-10-09 - Sub-phases 28.1 and 29.1, the 1.0 viability review, the decision to defer 30.1/30.2 |
| 58 | | 2026-10-09 - 30.1 (delta saves, server and store half) and 29.1 (two more rules) |
| 59 | | 2026-10-09 - everything that was left: 30.1/30.2, 34.1, 37.1, 38.1, 29.1, 28.1, 31.3 and the leftovers of 24.5, 35 and 36 |
| 60 | 2026-10-09 | the rename to UnENVerse, the Discord acceptance, restore-into-chunks, and a way to see the app |
| 61 | 2026-10-09 | CI fixes, dependency bumps, and making the phase numbering true again |
| 62 | 2026-10-09 | crate folders renamed, server container moved to ghcr unenverse, vault migrated to composites, node on the VPS (half done) |
| 63 | 2026-10-09 | second rename sweep, Apache-2.0, README and CHANGELOG rewrite, demo server and screenshots, CI hardening |
| 64 | 2026-10-09 | Windows CI portability, bundle display and Nodes loading |
| 65 | | roadmap R00 (baseline and instruction split), 2026-10-10 |
| 66 | | roadmap R01 (project phase 43), security and storage-engine hotfixes |
| 67 | | roadmap W1/R22 (project phase 44), the UnENVerse product website |
| 68 | | roadmap R02 (project phase 45), CI release gating and speed |
| 69 | | chaos testing program (project phase 46), concurrent-actor bug hunt and fixes |
| 70 | | Roadmap R03, dependency modernisation |
| 71 | | Roadmap R04, application-layer extraction |
| 72 | | R05 local operations and recovery |
| 73 | | R06 SFTP, retention and restore drill |
| 74 | | R07 metadata and lifecycle core |
| 75 | | R08 config parsers and migration core |
| 76 | 2026-10-14 | Roadmap R09, password-manager sources |
| 77 | 2026-10-15 | Website identity, TOTP audit and updater phase plan |
| 78 | 2026-10-15 | CI repair for Rustls advisories and Windows recovery tests |
| 79 | 2026-10-17 | Bundle cards, live reload, site rewrite, release-notes order |
| 80 | 2026-10-17 | Phase 54 CLI updater and code-scanning cleanup |
| 81 | 2026-10-17 | CI repairs, site wrap and SEO pass, llms.txt and badges |
| 82 | 2026-10-17 | Public trust round: Scorecard, SBOMs, ruleset, Best Practices and Baseline badges |
| 83 | 2026-10-17 | Rust behaviour tests: README-driven CLI contract suite and the ten bugs it found |
| 84 | 2026-10-18 | Rust behaviour tests, second stretch: users admin, structure, totp io, node agent, destinations |
| 85 | 2026-10-17 | Phase 56, TypeScript behaviour tests, coverage 71.9 to 99.5 percent, nineteen bugs fixed |
| 86 | | Phase 56, Rust behaviour tests, final state and branch preparation |
| 87 | 2026-10-18 | OpenSSF silver and gold work, year roadmap, SPDX headers, CI speed-up, trust badges, 0.56.1 |
| 88 | 2026-10-18 | after phase log 87, CI red-to-green on main, coverage measured, badges, forms ready |
| 89 | 2026-10-19 | Rust branch coverage push, behaviour tests, ten bugs fixed, PR #46 |
| 90 | 2026-10-20 | winget publishing, macOS and arm64 research |
| 91 | | (2026-10-22): roadmap R10 to R21 first slices, release 0.58.0 published |
| 92 | | (2026-10-22): R20 and R25 CLI halves, audit fixes, releases 0.59.0 and 0.60.0 |